Stronger Roads for a Longer Tomorrow · A RoadstaB product+91 98968 83663  |  WhatsApp  |  office@panel-x.in
Panel-X — Concrete Road Resurfacing & Maintenance Get Enquiry

Concrete road resurfacing & maintenance

Stronger Roads
for a Longer Tomorrow

Panel-X renews worn concrete roads with a 30 mm M-60 layer bonded to the existing slab. The road comes back stronger than it was built, at about half the cost, with traffic back in 24 hours.

~50%lower cost
24 hto open traffic
M-60replaces M-40
REPLACEWorn top 30 mm only
BONDActs as one with the slab
STRENGTHENM-60 · 60 MPa surface
OPENTraffic in 24 hours
~50% Cost EconomyOnly the top 30 mm is replaced
24 h to TrafficInstead of 55–60 days closed
M-60 Higher Strength60 MPa on a 40 MPa road
Eco-FriendlyExisting slab reused, not demolished

Engineered for real-world performance

Keep the slab.
Replace the surface.

Concrete roads fail at the top first, while the slab underneath still has years of life. Panel-X removes only the damaged top 30 mm of the existing M-40 concrete and bonds 30 mm of M-60 in its place. With a proper bond, the new layer and the old slab carry load together and pass it evenly to the layers beneath.

Layer replaced
30 mm
Existing concrete
M-40 · 40 MPa
Panel-X layer
M-60 · 60 MPa
Interface
Fully bonded
Traffic opening
24 hours
See the Process

How it works

From worn road to open road in six steps.

The process plays on its own as you scroll here. Click any step to stop on it, or replay the whole sequence.

Animated pavement cross-section showing the Panel-X process 30 mm removed Top 30 mmM-60 · 60 MPa Existing slabM-40 · 40 MPa Base Subgrade
06of 06

Open to traffic in 24 hours

The road is back in service the next day. The bonded M-60 layer spreads wheel loads evenly into the slab and the layers beneath.

~50%Lower cost than conventional
24 hTo open traffic
60 MPaSurface strength (M-60)
30 mmBonded layer only

Road closure

Sixty days of diversions, or one.

Each square is one day the road stays closed. Conventional reconstruction breaks out and recasts the whole slab; Panel-X works only on the top 30 mm.

Conventional

55–60 days closed

Panel-X

24 hours to traffic

Closed (conventional)Up to 60 daysPanel-X closure

1 day instead of 55–60

Built stronger

Comes back stronger than it was built.

The original road was laid in M-40 concrete. Its new surface is M-60, half as strong again, and bonded so the whole pavement carries load as one.

Proper bonding

The new layer and the old slab act as one section, not two separate layers.

Better load transfer

Wheel loads spread evenly into the slab and the layers beneath it.

More durable

A dense, high-strength surface resists wear, abrasion and water ingress.

40
MPa

Existing road · M-40

60
MPa

Panel-X layer · M-60

+50% surface strength

Why choose Panel-X?

Fast, strong, economical and green.

01~50%

Cost Economy

Only the top 30 mm is replaced: less demolition, less new concrete and less haulage than conventional reconstruction.

0224 h

Back to Traffic

Conventional work keeps a road closed for 55–60 days. A Panel-X stretch reopens the next day.

03M-60

Higher Strength

The new 60 MPa surface is stronger than the 40 MPa concrete it replaces.

04Bond

Load Transfer

A proper bond makes new layer and old slab act as one, spreading load evenly to the layers beneath.

05Life

More Durable

A dense, high-strength surface resists wear and water ingress, extending pavement life.

06Eco

Eco-Friendly

Reusing the existing slab avoids demolition waste and the cement, aggregate and fuel to rebuild it.

Savings estimator

See what half the cost looks like.

Enter your stretch and the rate you would pay for conventional reconstruction. Panel-X typically costs about half.

Your road

The rate below is an example. Replace it with your own.

Estimated saving with Panel-X₹1.75 Cr
Area
14,000 m²
Conventional
₹3.50 Cr
Panel-X (≈50%)
₹1.75 Cr
Closure per stretch
24 h vs 55–60 days

Indicative only. Final cost depends on site condition, access and quantities, confirmed after a site assessment.

Side by side

Panel-X against conventional reconstruction.

ParameterConventional reconstructionPanel-X
CostFull slab removal and recastingAbout 50% lower
Time to open traffic55–60 days24 hours
Surface concreteM-40 · 40 MPaM-60 · 60 MPa
Existing slabDemolishedRetained and reused
Load transferNew slab on prepared baseBonded layer works with the slab
Waste and materialHeavy demolition debris30 mm only, minimal waste
Traffic disruptionWeeks of diversionsOne closure window

Featured projects

From distressed pavement to dependable performance.

Discuss your project →

Product family

From the RoadstaB
product line.

Panel-X belongs to RoadstaB's family of road technologies, known to road builders for faster construction, longer pavement life and a lighter environmental footprint.

  • Existing slab reused, not demolished
  • Less cement, aggregate and haulage
  • Short closures, less idling traffic
  • Longer life, fewer repeat repairs
Talk to our team →
PROJECT FILM · COMING SOON

Closed tonight, open tomorrow

Technical resources

Everything an engineer needs.

Request the Panel-X technical data sheet, method statement, test reports and case studies for your project file.

Our footprint

Pune. Delhi. Moscow.

Hover over a location to see it on the map.

Open map ↗
Open map ↗
Open map ↗
30°E40°E50°E60°E70°E80°E90°E20°N30°N40°N50°N60°N Pune Delhi Moscow

Pune, Maharashtra, India

Let's build better roads together

Have a pavement problem?

Tell us the location, length, concrete condition and traffic on your stretch. Our team will come back with a site assessment and an estimate.

WhatsApp us